New Absorption Chiller Plant,
Champion International Corporation,
West Nyack, NY
ABSORPTION
CHILLER
&L designed a new absorption chiller plant for Champion's existing facility in West Nyack, Rockland County, NY. The project began as a study of the building's existing cooling load which has increased over the years.
The project included preparation of construction bid documents for replacement of a 35+ year old chiller with a new 455 ton absorption chiller. Larger chilled water and condenser water pumps were selected as well as larger CHW/CW piping systems. The cooling tower was performance tested and subsequently modified to perform at the increased capacity. The new chiller was installed through a temporary roof opening via crane, thus minimizing downtime and disruption within the facility. Structural and architectural subconsultants were used to design the large roof opening.